CBRN event in Hungary on Wed 5th September 2012
5th September 2012
On September 03, 2012, at 09:34 a.m., the fast-acting gate valve 10UV68S201 in the chilled water system was switched off in opened position (with the aim of providing appropriate chilled water for equipments within the hermetic area) in order to perform a planned repair. On September 05, 2012, at 03:00 p.m., the operating staff realized that the provision prescribed in item 5.6.4.3 of the Operational Limits and Conditions was not complied due to the switched off condition of the fast-acting gate valve. The switched off condition of the fast-acting gate valve is allowed by the Operational Limits and Conditions only for 24 hours. After realization of the event, the provision prescribed in the Operational Limits and Conditions was fulfilled by issuing the Operating Instruction No. 3006/2012 in which the scope of the required activities of the operating staff until completion of repair of the gate valve was specified.
Contextual analysis
Analysing the event count by highlighting the presence of munition categories over a six-month data period.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information
Information sources
Discussion and media of this event has been extracted from all sources.
Sign in to view this information
Country information
Click to view more information about the country and see more information on conflicts occuring in that region.
Hungary (HUN)
Discover more
Events using similar munitions or platforms and those that happen within a recent time line and proximity are displayed below.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information