CBRN
Radiological/Nuclear
CBRN event in Spain on Sat 7th July 1990
7th July 1990
Reactor coolant System Leakage of 280 Lit/H Upper Technical Specifications Limit (227 L/H). The leakage was located in a flowmeter on the reactor temperature detector (RTD) Line (loop A). The leakage was initatied at 21.15 hrs. (July 7) and isolated at 20.30 hrs (July 8). The plant remained in hot shutdown operation mode. The total leakage was 7.000 litres.
BASIS FOR RATING: Initiator frequency: Expected, real
Safety function availability: full
Insignificant on site impact inside containment. No off-site impact.
Contextual analysis
Analysing the event count by highlighting the presence of munition categories over a six-month data period.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information
Information sources
Discussion and media of this event has been extracted from all sources.
Sign in to view this information
Country information
Click to view more information about the country and see more information on conflicts occuring in that region.
Spain (ESP)
Discover more
Events using similar munitions or platforms and those that happen within a recent time line and proximity are displayed below.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information