CBRN
Radiological/Nuclear
CBRN event in Spain on Fri 31st January 1992
31st January 1992
On 31 January during the investigation of a minor event the staff of Trillo NPP detected a design error in the level instrumentation in the annulus outside the containment sphere (between the sphere and the containment building, 3 out of 4 sumps). This error would have affected the actuation of Residual Heat Removal System (RHR) during a small LOCA, in the recirculation phase. Because of the particular design of Trillo (KWU) this deficiency in 3 sumps would have resulted in inadequate safety function of RHR during a small LOCA.
This deficiency has been present since the start-up of the plant. The error has been corrected and the nuclear safety council is investigating the causes and actions of the Trillo staff. The plant is operating at full power.
Press release is attached.
Contextual analysis
Analysing the event count by highlighting the presence of munition categories over a six-month data period.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information
Information sources
Discussion and media of this event has been extracted from all sources.
Sign in to view this information
Country information
Click to view more information about the country and see more information on conflicts occuring in that region.
Spain (ESP)
Discover more
Events using similar munitions or platforms and those that happen within a recent time line and proximity are displayed below.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information