CBRN event in Switzerland on Fri 10th April 1992
10th April 1992
The plant was shut down and the fuel unloaded from the reactor and stored in the fuel pool. During tests of electrical equipments the only available offsite power supply was lost. Because the two available on-site diesel generator sets have to be started manually a total loss of AC power occurred. After 4.5 minutes offsite power supply was restored.
Basis for rating: According User Manual Section III.3.1.2
- Large water inventory in fuel pool gives enough time for corrective actions
- power supply restored in 4,5 minutes
- two diesel generator sets were available, which gives minor degradation of fuel pool cooling + level 0
Contextual analysis
Analysing the event count by highlighting the presence of munition categories over a six-month data period.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information
Information sources
Discussion and media of this event has been extracted from all sources.
Sign in to view this information
Country information
Click to view more information about the country and see more information on conflicts occuring in that region.
Switzerland (CHE)
Discover more
Events using similar munitions or platforms and those that happen within a recent time line and proximity are displayed below.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information