CBRN
Radiological/Nuclear
CBRN event in Brazil on Fri 7th February 1992
7th February 1992
During a scheduled outage for refueling and maintenance, the reactor, with the new fuel elements already in place, was in the cold shutdown condition. A loss of instrument air (due to loss of cooling of the non-safety related air compressors) led to full opening of a control valve of the residual heat removal (RHR) system, this led to an increase in the RHR pump flow. This pump was shut down by the operator, with the alleged intention of preventing its damage. The reactor stayed for 10 minutes without forced cooling and the reactor coolant temperature rose from 35 deg. C to 37 deg. C. The instrument air supply was restored and the RHR pump was put into service, no consequences were observed.
Contextual analysis
Analysing the event count by highlighting the presence of munition categories over a six-month data period.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information
Information sources
Discussion and media of this event has been extracted from all sources.
Sign in to view this information
Country information
Click to view more information about the country and see more information on conflicts occuring in that region.
Brazil (BRA)
Discover more
Events using similar munitions or platforms and those that happen within a recent time line and proximity are displayed below.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information