CBRN
Identified CBRN agent
Radiological/Nuclear
CBRN event in Peru on Mon 20th May 2013
20th May 2013
During radiographic operations performed by two radiographers the guide tube was squashed so the Ir-192 source could not be retracted to the gamma projector. Operations were being performed at 6 m height. The operator tried to correct this situation using a plier to strainghten out the guide tube but unsuccesfully . Then the guide tube was cut and the Ir-192 source was recovered using tongs and shieldings. The workers took personnel dosimeters, alarm dosimeters and detectors but radiation protection officer was absent. The recovery operation lasts 30 minutes and was not well planned and any record was completed of the event. The estimated doses received by operators were 29,65 mSv and 44,6 mSv. The company did not report in time this event as required by regulation. Currently the company sancioned by regulatory body.
Contextual analysis
Analysing the event count by highlighting the presence of munition categories over a six-month data period.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information
Information sources
Discussion and media of this event has been extracted from all sources.
Sign in to view this information
Country information
Click to view more information about the country and see more information on conflicts occuring in that region.
Peru (PER)
Discover more
Events using similar munitions or platforms and those that happen within a recent time line and proximity are displayed below.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information