CBRN

Radiological/Nuclear

CBRN event in South Africa on Mon 5th December 2005

5th December 2005

The source material and subsequent headlines on METIS are collated by our system and taken direct from source. The opinions and views expressed in these source articles and source headlines are not the views and opinions of METIS or its employees.
METIS is not able to substantiate the veracity of sources or check misinformation in real-time. Our analysis is based on currently reported information and may change as new information becomes available.

The event involved the unavailability of both low head safety injection (LHSI) motors for an extended period for certain accident scenarios that went undetected by all the present processes currently in use for surveillance, maintenance and testing. 
On 2005-12-05 both LHSI motors were declared inoperable because of reduced motor cooling water flow. An Operating Technical Specification Limiting Condition of Operation required the unit to be taken from a plant state of Intermediate Shutdown Residual Heat Removal system conditioned to Cold Shutdown within 24 hours. 
An engineering assessment of this condition concluded that the motor/pump combinations would not have been able to meet their design base accident functions with only 66% of the designed cooling flow to the motor. The motors would either have been damaged or destroyed if used as required by design or would have had to be taken out of service, to prevent damage, before they could complete their intended/designed mitigating functions during design base accident conditions.
The investigation determined that the incorrect re-assembly of the motor coolers resulted in the cooling flow to the motors to be restricted. This condition rendered both the low head safety injection (LHSI) motors inoperable. An analysis of archived records confirmed that the last interventions had been performed in 1993.

Contextual analysis

Analysing the event count by highlighting the presence of munition categories over a six-month data period.

Enterprise

Understand the complete picture with an Enterprise account.

Learn more

Sign in to view this information

Information sources

Discussion and media of this event has been extracted from all sources.

Sign in to view this information

Enterprise
Country information

Click to view more information about the country and see more information on conflicts occuring in that region.

South Africa (ZAF)

Discover more

Events using similar munitions or platforms and those that happen within a recent time line and proximity are displayed below.

Enterprise

Understand the complete picture with an Enterprise account.

Learn more

Sign in to view this information