Some elements on this page are available to enterprise users only. Get started

Back to top

CBRN

Radiological/Nuclear

CBRN event in Japan on Sat 12th March 2011

12th March 2011

The source material and subsequent headlines on METIS are collated by our system and taken direct from source. The opinions and views expressed in these source articles and source headlines are not the views and opinions of METIS or its employees.
METIS is not able to substantiate the veracity of sources or check misinformation in real-time. Our analysis is based on currently reported information and may change as new information becomes available.

The core damage by loss of all cooling function due to the big tsunami.-Provisional 2

Fukushima Dai-ichi Nuclear Power Station Unit 1, 2 and 3, which is in rated power operation, have automatically shut down around 14:46 (JST) in March 11, 2011 because of the Tohoku regional Pacific Ocean Offshore Earthquake.
After that, the power station was attacked by tsunami.
Electricity rooms and seawater pump rooms were flooded, and the cooling function became only the coolant injection of the turbine driven pump. The turbine driven pump operation increased the pressure of the suppression chamber, and it became impossible to continue the operation.
It means loss of all cooling function, and the declaration of a state of emergency was done.
The release valve was opened several times and injections of the sea water into the reactor vessel were carried out with fire extinguishing pumps. The gas in the containment vessel was also vented.
Then, the radioactive dose rate at site boundary had exceeded the limit value of 0.5 mSv/h.
This value is thought smaller than the value resulting in the release of a few per cent of core inventory of a power reactor from the fuel assemblies.
But the radioactive dose rate at the suppression chamber was high. And it is thought that hydrogen gas was generated enough to damage the reactor building.
The behavior of the pressure of the reactor vessel and the containment vessel, and the behavior of the water level of the reactor vessel were complicated. Some measurements were not possible because of failures of measurement equipment. As a result, the detailed estimate can not be done. 
But these values are thought the values resulting in the release of more than a few per cent of core inventory of a power reactor from the fuel assemblies.
The inhabitants of the range of 20 km took refuge. At least, one worker received a dose (about 106 mSv) in excess of the annual limit (100 mSv). But we can not rate on impact on people and the environment because the correspondence work still continues.

Contextual analysis

Analysing the event count by highlighting the presence of munition categories over a six-month data period.

Enterprise

Understand the complete picture with an Enterprise account.

Learn more

Sign in to view this information

Information sources

Discussion and media of this event has been extracted from all sources.

Sign in to view this information

Enterprise
Country information

Click to view more information about the country and see more information on conflicts occuring in that region.

Japan (JPN)

Discover more

Events using similar munitions or platforms and those that happen within a recent time line and proximity are displayed below.

Enterprise

Understand the complete picture with an Enterprise account.

Learn more

Sign in to view this information