1. Summary of Earthquake
(1) Time of Occurrence: 14:46 (UTC 5:46) March 11, 2011, Friday
(2) Epicenter: Off-Coast of Sanriku (North Latitude: 38; East Longitude: 142.9), 10km deep, M8.8
2. The status of operation at Power Stations(Number of automatic shutdown(units): 10 (as of 00:30(UTC:11:46), March12)
a. Onagawa Nuclear Power Station (Onagawa-machi and Ishinomaki–shi, Miyagi Prefecture)
(1) The status of operation
Unit 1 (524MWe): automatic shutdown
Unit 2 (825MWe): automatic shutdown
Unit 3 (825MWe): automatic shutdown
(2) Readings of monitoring post etc.
Variation in the monitoring post readings: No
Variation in the main stack monitor readings: No
(3) Report concerning other malfunction
Report of fire: CO2 extinguishment started at 17:15
b. Fukushima Dai-ichi Nuclear Power Station, Tokyo Electric Power Co.,Inc.(TEPCO) (Okuma-machi and Futaba-machi, Futaba-gun, Fukushima Prefecture )
(1) The status of operation
Unit 1 (460MWe): automatic shutdown
Unit 2 (784MWe): automatic shutdown
Unit 3 (784MWe): automatic shutdown
Unit 4(784MW): in periodic inspection outage
Unit 5(784MW): in periodic inspection outage
Unit 6(1,100MW): in periodic inspection outage
(2) Readings at monitoring post etc.
Variation in the monitoring post readings: No
Variation in the main stack monitoring readings: No
(3) Report concerning other malfunction
Article 10* of Act on Special Measures Concerning Nuclear Emergency Preparedness (Fukushima Dai-ichi, Unit 3)
(*A heightened alert condition)
Article 15** of Act on Special Measures Concerning Nuclear Emergency Preparedness (Fukushima Dai-ichi, Units 1 and 2)
(** Nuclear emergency situation)
Situation of power source to recover water injection function at the Station.
Three or four electric power source cars are waiting in the premise. Part of cable was obtained and connecting work is under way. This work is done with paying attention to tsunami. (2:00, March 12)
Pressure in the Confinement Vessel has arisen. The pressure could have arisen to 600kPa as compared to the design pressure of 400kPa.
c. Fukushima-Daini Nuclear Power Station(TEPCO)
(Naraha-cho/Tomioka-cho, Futaba-gun, Fukushima pref.)
(1) The status of operation
Unit1(1,100MW): automatic shutdown
Unit2(1,100MW): automatic shutdown
Unit3(1,100MW): automatic shutdown
Unit4(1,100MW): automatic shutdown
(2) Readings at monitoring post etc.
Variation in the monitoring post readings: No
Variation in the main stack monitoring readings: No
(3) Report concerning other malfunction
Report of fire: No
Article 10* of Act on Special Measures Concerning Nuclear Emergency Preparedness (Fukushima Dai-ni, Units 1,2 and 4)
(*A heightened alert condition)
Contextual analysis
Analysing the event count by highlighting the presence of munition categories over a six-month data period.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information
Information sources
Discussion and media of this event has been extracted from all sources.
Sign in to view this information
Country information
Click to view more information about the country and see more information on conflicts occuring in that region.
Japan (JPN)
Discover more
Events using similar munitions or platforms and those that happen within a recent time line and proximity are displayed below.
Understand the complete picture with an Enterprise account.
Learn moreSign in to view this information